新2手机网址www.hg108.vip)实时更新发布最新最快的新2手机网址、新2手机网址线路、新2手机网址登录网址、新2手机网址管理端、新2手机网址手机版登录网址、新2手机皇冠登录网址。

,

KUALA LUMPUR: Dagang Nexchange Bhd (DNeX), via its subsidiary Ping Petroleum UK PLC, has taken delivery of the Sevan Hummingbird Floating Production Storage and Offloading (FPSO) vessel from marine energy transportation company Teekay Corporation.

DNeX said the acquisition of the FPSO is a critical milestone in the Central North Sea Avalon Development Project, which the company continues to progress after receiving a letter of "no objections” from the North Sea Transition Authority (NSTA) in March this year for its proposed Avalon development plans.

It said Ping has also been recently granted a 19-month extension by NSTA to the second term of the

P2006 licence containing Avalon and this allows the company additional time to optimise and gain full regulatory approval of the Avalon Field Development Plan.

"The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external low-carbon source.

"The company is evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility, minimising diesel usage and associated greenhouse gas emissions,” it said in a statement today.

Besides, DNeX said the planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the UK’s energy security and net zero targets.

Meanwhile, DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the acquisition of the Sevan Hummingbird FPSO is a key milestone for the Avalon oilfield and the group anticipates full operational deployment of the facility on Avalon by 2025.

"We have a tangible asset ready with the newly acquired Sevan Hummingbird.

"Our next step is to secure approval for our Field Development Plan, which will be submitted in the coming months,” he said.

First commissioned in 2008, the Sevan Hummingbird FPSO is a 60-metre diameter facility, which has a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.

With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Ping’s second oilfield asset is expected to come onstream in 2025. - Bernama


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:新2手机网址(www.hg108.vip)_DNeX unit takes delivery of vessel for North Sea project
发布评论

分享到:

澳洲【zhou】幸运5是官方彩{cai}吗(www.a55555.net)_今 jin[天疫情记者会{hui}因台风暂《zan》停
1 条回复
  1. 猎球者(www.99cx.vip)
    猎球者(www.99cx.vip)
    (2022-07-10 00:00:40) 1#


    我词穷了,反正很好

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。